::: Construction Updates - October 2008 :::

 

 

 

Progress Work of both Towers taken from Shaw Blvd.

 

Progress Work of Glass Fins along Podium

 

 

 

On-going installation of windows at Tower 2 Facing Shangri-La Plaza Mall

On-going installation of windows at Tower 2 Facing St. Francis Rd.

 

 

 

On-going installation of windows at Tower 1 Facing EDSA Shangri-La Hotel

View from St. Francis Road corner Internal Road

 

 

 

Elevation of both Towers Facing EDSA Shangri-La Hotel

Elevation of both Towers Facing Shangri-La Plaza Mall

 

 

 

Water Tank at Tower 1

Upper Roof of Water Tank

 

 

 

Progress work at the Grand Penthouse Sky Lounge facing EDSA

Progress work at the Grand Penthouse Sky Lounge facing EDSA

 

On-going Installation of Windows at Tower 1 facing St. Francis Rd.

Progress Work of the TSFSP Project

 

 

 

 

On-going Installation of Windows at Tower 1 facing Shaw Blvd.

Progress Work at the Grand Penthouse Sky Lounge

 

 

 

Progress Work of the Swimming Pool

On-going Installation of the Spiral Stairs  at 10th Level

Progress Work along Ground Floor (Water Feature)

 

On-going Installation of Windows at Tower 1 facing EDSA

On-going Installation of Windows at Tower 1 facing Shaw Blvd.

1

2

 

On-going Installation of Windows at Tower 2 facing St. Francis Rd.

On-going Installation of Windows at Tower 1 facing EDSA Shangri-La Hotel

3

4

 

 

On-going Installation of Windows at Tower 2 facing St. Francis Rd.

On-going Installation of Windows at Tower 1 facing EDSA      

5

6