Straight to Finish Slab (Area 1) at the 60th Floor of Tower 1.

Line & Grade of Rebars at the Infinity Pool of Tower 2

 

Project:
     THE ST. FRANCIS SHANGRI-LA PLACE

Progress Work of the TSFSP Project

On-going installation of windows at Tower 2 Facing Shangri-La Mall

On-going installation of windows at Tower 2 Facing St. Francis Rd.

 

Project:
     THE ST. FRANCIS SHANGRI-LA PLACE

Progress Work of the TSFSP Project

On-going Installation of Windows at Tower 1 Facing Shangri-La Mall

View from St. Francis Rd. corner Internal Rd.

 

Project:
THE ST. FRANCIS SHANGRI-LA PLACE

Progress Work at TSFSP Tower 1

Glass Fins & Railings at Podium 2 to Podium 7

Potable Water Line at the 48th Floor of Tower 2

 

Project:
THE ST. FRANCIS SHANGRI-LA PLACE

Progress Work at TSFSP Project

Installed Sewer Line at the 48th Floor of Tower 1

Installed Vent & Potable Water Lines at the 56th Floor of Tower 1

 

Project:
THE ST. FRANCIS SHANGRI-LA PLACE

Progress Work at TSFSP Project

Construction Progress at Unit G the 10th Floor of Tower 1 (Mock-up Unit)

Top View of the Swimming Pool at the 8th Level

 

Project:
     THE ST. FRANCIS SHANGRI-LA PLACE

Progress Work of the TSFSP Project

On-going Installation of Formworks for Beams, Girders & Slab at the 10th Level

 

Project:
THE ST. FRANCIS SHANGRI-LA PLACE

Progress Work of the TSFSP Project

After Concrete Pouring of Slab (Area 1) at the Roof Tower 2

On-going Installation of Rebar for Upstand Wall at the Infinity Pool of Tower 2

 

Project:
     THE ST. FRANCIS SHANGRI-LA PLACE

Installation of Viscous Damper

View from the East and West Side Towers

Project:
     THE ST. FRANCIS SHANGRI-LA PLACE

Installation of Viscous Damper