::: Construction Updates - July 2008 :::
|
| |
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Progress Work of the TSFSP Project |

|
Straight to Finish Slab (Area 1) at the 60th Floor of Tower 1. |

|
Line & Grade of Rebars at the Infinity Pool of Tower 2 |
|
| |
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Progress Work of the TSFSP Project |

|

|
On-going installation of windows at Tower 2 Facing Shangri-La Mall |
On-going installation of windows at Tower 2 Facing St. Francis Rd. |
|
| |
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Progress Work of the TSFSP Project |

|

|
On-going Installation of Windows at Tower 1 Facing Shangri-La Mall |
View from St. Francis Rd. corner Internal Rd. |
|
| |
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Progress Work at TSFSP Tower 1 |

|
Glass Fins & Railings at Podium 2 to Podium 7 |

|
Potable Water Line at the 48th Floor of Tower 2 |
|
| |
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Progress Work at TSFSP Project |

|
Installed Sewer Line at the 48th Floor of Tower 1 |

|
Installed Vent & Potable Water Lines at the 56th Floor of Tower 1 |
|
| |
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Progress Work at TSFSP Project |

|
Construction Progress at Unit G the 10th Floor of Tower 1 (Mock-up Unit) |

|
Top View of the Swimming Pool at the 8th Level |
|
| |
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Progress Work of the TSFSP Project |

|

|
On-going Installation of Formworks for Beams, Girders & Slab at the 10th Level |
|
| |
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Progress Work of the TSFSP Project |

|
After Concrete Pouring of Slab (Area 1) at the Roof Tower 2 |

|
On-going Installation of Rebar for Upstand Wall at the Infinity Pool of Tower 2 |
|
| |
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Installation of Viscous Damper |

|

|
View from the East and West Side Towers |
|
Project:
THE ST. FRANCIS SHANGRI-LA PLACE |
Installation of Viscous Damper |

|

|
View from the South and North Side Towers |
|
| |
| |
| |
| |
| |
| |
| |
| |
| |
| |